We are all from different countries, and we weren't in the same place at the same time. Therefore, some members of the group were unable to join the call because in challenging times like these, communication is limited. The time zone challenges and internet crashes made us push back the start of the project that led to another problem, time constraints.
A solution we found was delegating the tasks. Splitting them into frontend design, the presentation, and backend development.